Doemens e. V. intends to build a new training and further education facility with administration. The planned building project is a facility for inter-company vocational training. The objective of the planning is a compact three-story building on Lohenstrasse.
The current tender relates to the execution of the building automation.
Core quantities:
3 ISPs with approx. 17 switch cabinet fields approx. 750 data points for the HVAC system:
3x ventilation system (heating, cooling, heat recovery) 1x ventilation system (heating, heat recovery) 4x digestorium Various small fans heating / cooling system:
Groundwater well system Groundwater heat pump Groundwater free cooling Gas condensing boiler Concrete core temperature control (heating / cooling) Underfloor heating Heating / cooling ceilings Sanitary work:
Grease separator softening wastewater neutralization
Raw installation: 14.9.2020-23.10.2020 Fine installation: 14.12.2020-31.7.2021,
Commissioning: 1.9.2021 The individual construction dates are to be coordinated with the construction management.
Doemens e. V. intends to build a new training and further education facility with administration. The planned building project is a facility for inter-company vocational training. The objective of the planning is a compact three-story building on Lohenstrasse.
The current tender relates to the execution of the building automation.
Core quantities:
3 ISPs with approx. 17 switch cabinet fields approx. 750 data points for the HVAC system:
3x ventilation system (heating, cooling, heat recovery) 1x ventilation system (heating, heat recovery) 4x digestorium Various small fans heating / cooling system:
Groundwater well system Groundwater heat pump Groundwater free cooling Gas condensing boiler Concrete core temperature control (heating / cooling) Underfloor heating Heating / cooling ceilings Sanitary work:
Grease separator softening wastewater neutralization
Raw installation: 14.9.2020-23.10.2020 Fine installation: 14.12.2020-31.7.2021,
Commissioning: 1.9.2021 The individual construction dates are to be coordinated with the construction management.