Electrical fitting work | Tenderlake

Electrical fitting work

Contract Value:
EUR 18M - 18M
Notice Type:
Contract Notice
Published Date:
12 June 2020
Closing Date:
14 July 2020
Location(s):
DE212 München, Kreisfreie Stadt (DE Germany/DEUTSCHLAND)
Description:
New administration and training building Doemens eV

Doemens e. V. intends to build a new training and further education facility with administration. The planned building project is a facility for inter-company vocational training. The objective of the planning is a compact three-story building on Lohenstrasse.

The current tender relates to the execution of the building automation.

Core quantities:

3 ISPs with approx. 17 switch cabinet fields approx. 750 data points for the HVAC system:

3x ventilation system (heating, cooling, heat recovery) 1x ventilation system (heating, heat recovery) 4x digestorium Various small fans heating / cooling system:

Groundwater well system Groundwater heat pump Groundwater free cooling Gas condensing boiler Concrete core temperature control (heating / cooling) Underfloor heating Heating / cooling ceilings Sanitary work:

Grease separator softening wastewater neutralization

Raw installation: 14.9.2020-23.10.2020 Fine installation: 14.12.2020-31.7.2021,

Commissioning: 1.9.2021 The individual construction dates are to be coordinated with the construction management.

Doemens e. V. intends to build a new training and further education facility with administration. The planned building project is a facility for inter-company vocational training. The objective of the planning is a compact three-story building on Lohenstrasse.

The current tender relates to the execution of the building automation.

Core quantities:

3 ISPs with approx. 17 switch cabinet fields approx. 750 data points for the HVAC system:

3x ventilation system (heating, cooling, heat recovery) 1x ventilation system (heating, heat recovery) 4x digestorium Various small fans heating / cooling system:

Groundwater well system Groundwater heat pump Groundwater free cooling Gas condensing boiler Concrete core temperature control (heating / cooling) Underfloor heating Heating / cooling ceilings Sanitary work:

Grease separator softening wastewater neutralization

Raw installation: 14.9.2020-23.10.2020 Fine installation: 14.12.2020-31.7.2021,

Commissioning: 1.9.2021 The individual construction dates are to be coordinated with the construction management.

Download full details as .pdf
The Buyer:
Doemens e.V.
CPV Code(s):
45231000 - Construction work for pipelines, communication and power lines
45311200 - Electrical fitting work
45317000 - Other electrical installation work