The services required by this new contract are:
• Operation & maintenance of Fellside Steam Generating Units (Fellside Boiler Park)
• Operation & maintenance of existing CHP (Gas Turbine 1(GT1) & Auxiliary Boiler, Steam Turbine and ancillary equipment) and transition to a care and surveillance programme currently.
• Continuation and ongoing care and surveillance programme for Fellside retired CHP assets
• Decommissioning, dismantling and removal of retired CHP assets
The services required by this new contract are:
• Operation & maintenance of Fellside Steam Generating Units (Fellside Boiler Park)
• Operation & maintenance of existing CHP (Gas Turbine 1(GT1) & Auxiliary Boiler, Steam Turbine and ancillary equipment) and transition to a care and surveillance programme currently.
• Continuation and ongoing care and surveillance programme for Fellside retired CHP assets
• Decommissioning, dismantling and removal of retired CHP assets