New construction of the Schwäbisch Hall correctional facility
Ventilation systems
- Pos. 01 consisting of 2 ventilation systems for the station building with heat recovery, heating, cooling and cooling
Filters with 25,000m3/h each
- Item 02 consisting of 1 ventilation system for occupational therapy
- Pos. 03 1 Kitchen ventilation unit with heat recovery, heating and filtering with approx. 7,000m3/h
- Approx. 400 fire dampers 230V for pos. 01
- Approx. 40 fire dampers 230V for pos. 02
- Approx. 20 fire dampers 230V for pos. 03
- Ca. 8 Entrauchungsklappen
- Ca. 400 Konstantvolumenstromregler
- Ca. 300 Drallluftauslässe
- Approx. 180 poppet valves supply and exhaust air
- Ca. 400 Telefonieschalldämpfer
- Ca. 50 Kulissenschalldämpfer
- Approx. 5800m2 ventilation duct incl. insulation
- Ca. 2400m Wickelfalzrohr
- Ventilation ceiling for the kitchen area
- Approx. 10 EDP split air conditioners
- Lüftungsfunktionsdecke