The services to be carried out include the production of the protective equipment described in the attached plan documents (map scale 1: 1000, appendix 7, pages 19-27) in the course of the new construction of the B50 between Platten and Longkamp.
The construction measure includes in particular the following services:
- production SE of both directional lanes in the median strip and roadside,
- production of strip foundations,
- Production of crash cushions.