Landschaftsbauarbeiten
Landscaping work:
approx. 70 cbm trenches and pipes
approx. 40 running metres of façade gutters
approx. 370 cbm drain layer 16/32 on TG
approx. 1300 cbm gravel base course 0/32
approx. 4300 qm gravel base layer 0/45
approx. 440 m concrete curb
approx. 2500 qm concrete block pavement
approx. 560 qm asphalt base and surface course
approx. 790 cbm filling with red layer or gravel sand
approx. 160 running metres paving channel made of concrete block
approx. 340 sqm water-bound ceiling
approx. 225sqm synthetic turf grid
Equipment: approx. 60 bicycle parkers and approx. 196 bicycle double parkers
various Corten steel raised beds / benches