The service of the contractor includes the complete creation of the heating system including the hot water preparation and the convection cooling systems. Essentially consisting of:
- approx. 1,000 m black threaded pipe DN 15 to DN 50,
- approx. 580 m stainless steel press fitting pipe DN 12 to DN 32,
- 1 pc fresh water station,
- 1 pc. District heating compact station 275 kW,
- 2 heating distributors,
- approx. 8 pc. Circulation pumps,
- approx. 57 plate radiators,
- approx. 33 radiant ceiling panels,
- approx. 910 m
- 4 pieces of convection cooling split systems,
- insulation of the pipe network,
- approx. 30 fire protection mortar.
s. II.1.4)