For the section N01 Bern Wankdorf – Schönbühl a general project (GP) and an implementation project (AP) for the 8-lane expansion of the national road have been developed. The area between the Schönbühl junction and the Schönbühl junction as well as the redesign of the junction and the two junctions are also part of the project. The GP was approved by the Federal Council on 30.11.2018. The AP was open to the public from 26.09 – 25.10.2023. At the same time as the 8-lane expansion, the existing motorway infrastructure will be repaired. The extension length is around 7 km. The present advertised mandate includes the services of the project author Environment for UBB, BBB and coordination of clearing. The subject of this tender is the engineering services for the DP/MP phases to commissioning (SIA phases 32 – 53). The services of the landscape planner (LBP) are part of a separate tender.
For the section N01 Bern Wankdorf – Schönbühl a general project (GP) and an implementation project (AP) for the 8-lane expansion of the national road have been developed. The area between the Schönbühl junction and the Schönbühl junction as well as the redesign of the junction and the two junctions are also part of the project. The GP was approved by the Federal Council on 30.11.2018. The AP was open to the public from 26.09 – 25.10.2023. At the same time as the 8-lane expansion, the existing motorway infrastructure will be repaired. The extension length is around 7 km. The present advertised mandate includes the services of the project author Environment for UBB, BBB and coordination of clearing. The subject of this tender is the engineering services for the DP/MP phases to commissioning (SIA phases 32 – 53). The services of the landscape planner (LBP) are part of a separate tender.