This service is related to the Drilling of a geothermal doublet in the Slochteren formation at a depth of between 3 200 and 3 600 meters true vertical.
Both producer and injector well will be drilled deviated, ending at outstep of about 1 300 meters at reservoir depth. The expected production (p90) of the system is 165 m3/hr. It is the aim of the project to obtain a maximum production 200 m3/hr.
This service is related to the Drilling of a geothermal doublet in the Slochteren formation at a depth of between 3 200 and 3 600 meters true vertical.
Both producer and injector well will be drilled deviated, ending at outstep of about 1 300 meters at reservoir depth. The expected production (p90) of the system is 165 m3/hr. It is the aim of the project to obtain a maximum production 200 m3/hr.