Regulatory measures O2.1 + 2.2 - dismantling of 5 buildings, surface sealing and technical infrastructure, rehabilitation of soil contamination and clearance of the center of combat.
Regulatory measures O2.1 + 2.2 - demolition of 4 buildings and partial demolition of one building (total area approx. 72,000 cubic meters), demolition of surface sealing and technical infrastructure (underground cables and wires) as well as remediation of soil contamination and clearance of the battlefield to approx. 27,000 Square meters, disposal of approx. 30,000 tons of soil materials, reinstallation of soil materials.