Renovation and new construction of the existing bathing hall
- Energy supply by means of new NSHV in the KG with converter measurement and up to 8 internal site measurements.
Supply of 3 sub-distributions for floating technology/heating/ventilation (on site), already existing sub-distributions
-Sub-distributions consisting of KNX actuators (approx. 30 pieces), fuse elements D02 to 63 A (approx. 20 pieces), 4-pole RCD (approx. 20 pieces)
and miniature circuit breakers up to 32A (approx. 200 pieces)
-Installation systems as cable tray (200mm - 500mm wide) with approx. 250 m and associated approx. 160 pieces boom, as channel (approx. 10 0m)
-Installation cables from 1.5mm² to 6mm² of approx. 9600 m
-Unshielded control cables up to 1mm² of approx. 550 m
-Telecommunication installation cable 0.6mm² to 0.8mm² of approx. 3200 m
-Insulated power cable 1.5mm² to 35mm² from approx. 1800 m
-Data lines up to 600 MHz of approx. 500 m
-Safety cables and wires from 0.8mm² to 2.5mm² E30 of approx. 1000 m
-Sockets on and under plaster of 150 pieces
-Lighting consisting of surface-mounted luminaires LED 100 pieces, square ceiling recessed downlight LED 70 pieces, wall lights LED 15 pieces,
Pool spotlight POW-LED 25 pieces, floodlight LED 15 pieces, recessed downlights LED 150 pieces, bollard lights LED 15 pieces;
-Emergency lighting system with central battery
-KNX sensors & motion detectors of approx. 50 pieces
-Hazard detection and monitoring systems with 5 video cameras, 120 fire detectors, 50 signal transmitters, 15 handheld fire detectors,
Fire brigade information centre with FBF & FBZ, fire alarm centre with four loops;
-ELA with 10 surface-mounted and 30 built-in loudspeakers, including mixing console and sound system for the bathing hall
-Clock system with main & secondary clocks approx. 15 pieces