The subject of the contract is the implementation of the task - an investment entitled: RES in PEC- Gliwice Sp. z o.o. at 135 Królewska Tamy Street in Gliwice. The scope of the contract includes the delivery and installation of the RES source, along with the development of the necessary documentation and obtaining the required permits, if required, at the ZC-1 thermal plant at 135 Królewska Tamy Street in Gliwice, the WP70 boiler room building.
Delivery and assembly (photovoltaic microinstallation with a capacity of up to 50 kW) of a set of PV photovoltaic collectors in the following industries: construction, construction, electrical, i&C according to the requirements of PEC-Gliwice sp. z o. o. and applicable regulations.
The scope of work includes all work and activities necessary to complete the task, including the following elements:
- delivery and assembly of microinstallations (with a capacity of about 50 kW, but not exceeding this value) of PV photovoltaic panels along with the implementation of cable routes, cables, inverter with a power matched to the power of photovoltaic panels with the possibility of connecting energy storage (without storage). The delivered and installed elements must meet the program of supporting the project in the field of renewable energy sources for ENTREPRENEURS UNDER THE TITLE "50 kW NA START" announced by WFOŚiGW in Katowice
The detailed scope of the contract and the terms of implementation are specified in the Description of the subject of the contract, constituting an attachment to the SWZ. Other conditions for the execution of the contract are specified in the Draft provisions of the contract - Annex to SWZ.