Construction area 1:
- approx. 1 700 m
- approx. 750 m
- approx. 145 m
- approx. 555 m of pavement line Grauwacke-Großstein 1- / 2- / 3-line,
- approx. 180 m steel band edging,
- approx. 800 m of various branch line trenches,
- 77 pieces of concrete stone steps,
- 22 pieces of wall washers, handrails, pressed gratings in various formats,
- 19 pieces of tree planting,
- 130 m
- approx. 300 m
- approx. 45 m railing,
- approx. 23 m³ reinforced concrete wall,
- approx. 430 m
Construction area 2:
- approx. 2,500 m
- 470 m
- approx. 600 m
- approx. 1 200 m
- approx. 145 m
- approx. 1,100 m of pavement line Grauwacke-Großstein 1- / 2- / 3-line,
- approx. 50 m steel band edging,
- approx. 1,150 m of various branch line trenches,
- 24 pieces of concrete stone steps,
- approx. 5 m³ reinforced concrete wall,
- 183 pieces of natural stone steps,
- 14 m
- 8 pieces of tree planting,
- 40 m
Landscaping works for the 2nd construction phase of the overall measure "Umgestaltung Wiehlaue" in the northern and western parts of the old spa gardens are tendered as part of the ISEK Wiehl Center with the following main services:
- 120 t asphalt rubble,
- 1 420 m
- 1 285 m
- 1 100 m
- 60 m
- 55 m
- 30 m
- 1 pc water connection bollard,
- 92 m
- 6 floor recessed lights,
- 1 pc power connection bollard,
- 24 m
- 57 seat blocks and slabs as precast concrete parts,
- 37 m concrete block steps,
- 860 m
- 1,970 m
- 1 000 m
- 880 m
- 120 m
- 320 m
- 22 pcs of benches,
- 4 waste bins,
- 11 pcs of bicycle racks,
- 4 steel handrails,
- 18 new tree plantings,
- 1 210 m
- 1 300 m