Underground work other than tunnels, shafts and subways

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
30 March 2021
Closing Date:
27 April 2021
Location(s):
DEA2A Oberbergischer Kreis (DE Germany/DEUTSCHLAND)
Description:
3.4.5 / 3.4.6 / 3.4.13 / 3.4.29 / 4.2.4 Redesign of street areas in Wiehl (Bahnhofstr./Hauptstr.)

Construction area 1:

- approx. 1 700 m 2 Concrete pavement, unbound construction,

- approx. 750 m 2 Asphalt,

- approx. 145 m 2 Water-bound path cover,

- approx. 555 m of pavement line Grauwacke-Großstein 1- / 2- / 3-line,

- approx. 180 m steel band edging,

- approx. 800 m of various branch line trenches,

- 77 pieces of concrete stone steps,

- 22 pieces of wall washers, handrails, pressed gratings in various formats,

- 19 pieces of tree planting,

- 130 m 2 Vegetation areas completion and development maintenance,

- approx. 300 m 2 Bridge renovation,

- approx. 45 m railing,

- approx. 23 m³ reinforced concrete wall,

- approx. 430 m 2 Scaffolding demolition of the toilet facility.

Construction area 2:

- approx. 2,500 m 2 Natural stone slabs greywacke,

- 470 m 2 Small stone pavement,

- approx. 600 m 2 Asphalt,

- approx. 1 200 m 2 Colored asphalt,

- approx. 145 m 2 Water-bound path cover,

- approx. 1,100 m of pavement line Grauwacke-Großstein 1- / 2- / 3-line,

- approx. 50 m steel band edging,

- approx. 1,150 m of various branch line trenches,

- 24 pieces of concrete stone steps,

- approx. 5 m³ reinforced concrete wall,

- 183 pieces of natural stone steps,

- 14 m 2 Wall cladding Handrails, pressed gratings in various formats,

- 8 pieces of tree planting,

- 40 m 2 Vegetation area completion and development maintenance.

Landscaping works for the 2nd construction phase of the overall measure "Umgestaltung Wiehlaue" in the northern and western parts of the old spa gardens are tendered as part of the ISEK Wiehl Center with the following main services:

- 120 t asphalt rubble,

- 1 420 m 2 Pick up pavement,

- 1 285 m 3 Include unbound fastening,

- 1 100 m 3 Soil excavation and disposal,

- 60 m 3 Filling bottom,

- 55 m 3 Trench excavation for sewer pipes,

- 30 m 3 Trench excavation for water pipes,

- 1 pc water connection bollard,

- 92 m 3 Trench excavation for power cables,

- 6 floor recessed lights,

- 1 pc power connection bollard,

- 24 m 3 Reinforced concrete,

- 57 seat blocks and slabs as precast concrete parts,

- 37 m concrete block steps,

- 860 m 3 Gravel base layer,

- 1,970 m 2 Asphalt base course,

- 1 000 m 2 Asphalt surface course,

- 880 m 2 Colored asphalt surface course,

- 120 m 2 Colored mastic asphalt top layer,

- 320 m 2 Water-bound path cover,

- 22 pcs of benches,

- 4 waste bins,

- 11 pcs of bicycle racks,

- 4 steel handrails,

- 18 new tree plantings,

- 1 210 m 2 Planting and perennial areas,

- 1 300 m 2 Lawns completion maintenance.