Painting works for the renovation of the existing building “old Maria Stadler House” and reuse of the building
as an extension of the municipal administration, community housing for seniors and dorm for nurses and daycare staff
1772 m² full filling Q3 - GK walls
2300 m² on plastered ceilings
9040 m² primer wall surfaces
9040 m² initial coating on wet abrasion class 2 walls
2711 m² initial coating on dc. -blankets
542 m² initial coating on GK ceilings smooth
841 m² initial coating perforated on GK ceilings
500 m² coating floor, dust-binding
70 m² epoxy resin primer
70 m² epoxy resin coating
116 m² double-sided renovation painting door leaf (wood)
102 m renovation painting frames (wood)
96 m renovation painting frames (steel)
25 repairs damaged areas stair railing
64m overhaul crash railing, horizontal
46 m overhaul coating stair railing, rising
100 m overhaul balcony railing round
20m overhaul balcony railing, horizontal
32m coating, handrail inside, wood
160 m² overhaul leasing Q3
453 m² overhaul coating walls TRH 1-3
65 m² overhaul coating ceiling TRH 1-3