Creating a centralized production:
— 7MW (1.3 + 5 MW) wood boiler room,
— smoke recovery system (condensers),
— PAC on returns,
— gas boiler room (7 + 4 MW). A timber storage autonomy of at least three days (600 m
Lot #2: Structure/second work.
Lot #4: hydraulic/pumps/gas boiler roomLot #4: hydraulic/pumps/gas boiler room.
Lot #5: FumisterieLot #5: Fumistery.
Lot #6: Electricity/ControlLot #6: Electricity/Control Control