construction project
Extension to the secondary school tom-Brok-Straße. The extension is being built directly on the existing building. It is a three-storey building. The following constructions are planned:
Founding: Deep foundation
Exterior wall: Rear masonry / insulation / facing or partially (subordinate) curtain wall façade
Roof structure: reinforced concrete ceiling / vapour barrier / insulation / waterproofing
1 St. UVT
1000 m NHXMH-j 3x2,4m²
100 m NHXMH-j 5x2.4m
750 m Concrete Fixed Installation Capacity NI2XY-J 3 x 1.5mm²
750 m Concrete Resistant Installation Capacity NI2XY-J 3 x 2.5mm²
500 m Concrete Fixed Installation Capacity NI2XY-J 5 x 1.5mm²
150 m Concrete Resistant Installation Capacity NI2XY-J 5 x 16 mm²
75 pcs. 1-way socket with earth contact uP
150 m ceiling girder 300mm
500 pcs. collection holder plastic
140 pcs LED panel light
2 pcs System Amplifier