The regional branch East Westphalia-Lippe award the object and structural engineering for the design of the new construction of 1 bridge structure (BW 1, incl. temporary bridge), noise barriers and 2 rain clarifiers in the course of the new construction of the L 712n Bielefeld Brake/Altenhagen, 4.BA, B 61 — L 778.
The order for the bridge structure BW 1 includes the processing phases 1-3 and 6 in the performance diagram Planning Engineering Structures and the processing phases 2 and 3 in the performance diagram Structural Engineering. In addition, the design order for BW 1 includes the manufacture of the makeshift bridge and the production of medium-length construction.
The order for the 2 rainwater sewage tanks includes processing phases 1 and 6 in the performance diagram Planning Engineering Structures and the processing phases 2 and 3 in the performance diagram Structural Engineering.
The order for noise barriers includes processing phases 1, 3 and 6 in the performance diagram Planning Engineering Structures and the processing phases 2 and 3 in the performance diagram structural engineering.