Delivery of four turnouts including acceptance in the turnout plant and installation supervision
Delivery of four deep groove diverters
- IBW Ri60-120-21 left with protruding tongue
- EW Ri60-50m right, as a fallback switch
- EW Ri60-50m right
- EW Ri60-100m links
All turnouts must be pre-equipped for electrical operation.