1. The object of the order is:
1.1 Part I Supply of electricity to DOW NFZ buildings in Wrocław
1.2 Part II Supply of electricity to the DOW NFZ building in Jelenia Góra
1.3 Part III Supply of electricity to the DOW NFZ building in Legnica
on the terms set out in the Energy Law of 10 April 1997 and in the implementing acts issued on its basis and the rules resulting from the Act of 11 September 2019. Public procurement law.
Supply of electricity to DOW NFZ buildings in WrocławBuilding A at 6 Joannitów Street in Wrocław
Connection power of the building 165 kW
Conventional power 165 kW
Grupa przyłączeniowa IV
Tariff group C21
Estimated consumption for 2023 420,000 kWh
Electricity is transmitted via the ZK – 3b connection with a voltage of 0.4 kV
Building A at 6 Joannitów Street in Wrocław - RESERVE
Connected power 30 kW
Conventional power 15 kW
Connection group V
Tariff group C 11
Building C at 2 Dawida Street in Wrocław
Building connection power 160 kW
Conventional power 160 kW
Grupa przyłączeniowa IV
Tariff group C21
Estimated consumption for 2023 360,000 kWh
Electricity is transmitted to the place of delivery by cable line, connector ZK 3a. The limit of ownership set at the current terminals at the output of the wires from the protection in the ZK -3a connector towards the recipient's installation.
Building B at Gliniana Street No. 20-22 in Wrocław
Connection power of the building 40 kW
Conventional power 40 kW
Connection group V
Tariff group C11
The limit of ownership set at the current terminals at the output of the wires from the protection in the connector, towards the consumer installation.
Estimated consumption for 2023 18,000 kWh
Supply of electricity to the DOW NFZ building in Jelenia GóraBuilding at 18 Wolności Street in Jelenia Góra
Connection power of the building 52 kW
Conventional power 14 kW
Grupa przyłączeniowa IV
Tariff group C21
Estimated consumption for 2023 7,200 kWh
The place of supply of electricity are the WLZ terminals in the ZK-3.
Supply of electricity to the DOW NFZ building in LegnicaBuilding at 7 Jana Pawła II Street in Legnica
Connection power of the building 70 kW
Conventional power 40 kW
Connection group V
Tariff group C11
Estimated consumption for 2023 42,000 kWh
The place of supply of electricity is the connection – transformer station R 274-11 with a voltage of 04, kV
The place of delimitation of the properties of power equipment are current terminals at the outlet of the wires from the protection in the connector, towards the Customer's installation.