This consultation concerns the preventive, corrective maintenance, supply and works of electrical and energy equipment and installations at Change. This contract covers the needs of the Metz-Tessy and Saint-Julien en Genevois site. It may, if necessary, cover all GHT establishments. The needs may be modified (addition of new quantities) during the execution of the contract (R. 3135-1 of the CCP) depending on the works and real estate extension of each establishment.
Market form: ordinary. Award of a contract for each lot. Contract concluded for an initial period of 3 years, from 1.1.2020 until 31.12.2022 (lots 1 to 7) and 5 years from 1.1.2020 to 31.12.2024 (lot 8).
Offer of preventive maintenance, global healing of HV / LV substations (installation of backup generators during maintenance).
Technical support: on-call 24/24, intervention time 4h, maintenance level 1 to 4, planning over 5 years, Kit 1
Sites: CH Annecy Genevois Metz-Tessy (TNC), RSF Annecy, (TNC) Seynod, (TNC) mental health Metz-Tessy, (TNC), CH Saint-Julien (IT).
List of equipment: 14 posts including:
- 19 dry transfos,
- 6 oil transferr (Tesar) YC isolation and SFRA tests,
- 66 cells (apple tree),
- 16 chargers,
- 68 batteries,
- 7 batteries of capacitors (alps technology),
- 21 circuit breakers (MGE),
- 21 TGBT.
In-service year 2008.
Provision of preventive maintenance, overall curative of generators. Technical support: electrical mechanics, on-call 24/24 + monthly visit, intervention time 4h, maintenance level 1 to 4, planning over 5 years, kit 1
Sites: NHRA Metz-Tessy, RSF Annecy (GE Mobile), Seynod, CH Saint-Julien.
List of respective equipment:
- 3 GE mtu of 1275 kVa + 3 GE 1600 kVa in 2022,
- 1 GE SDMO 300 kVa (mobile),
- 1 GE Pramac 650 kVa,
- 1 GE Caterpilar 1000 kVa.
Year of commissioning 2008.
Offer preventive maintenance, curative global data center inverters and others. Technical support: on-call 24/24 + monthly visit, intervention time 4h maintenance level 1 to 4, planning over 5 years, Kit 1
Sites: Change Metz -Tessy, RSF Annecy, Seynod, Saint-Julien CH.
List of equipment:
- 6 inverters of 80 kVa type Galaxy 5000,
- 5 inverters of 11 to 40 kVA type COMET and Socomec,
- 4 inverters of 100 kVa type Galaxy 5500 data center,
- 5 EATON inverters from 2 to 15kVa,
- 12 Legrand MSII inverters from 6 to 30 kVa,
- 1 Socomec Masterys BC 15 kVa inverter.
Year of commissioning 2008.
Provision of preventive maintenance, global curative cold chilling production groups.
Technical support + monthly visit + stripping, on-call 24/24 + monthly visit, intervention time 4h, maintenance level 1 to 4, planning over 5 years, Kit 1
Sites: Change Metz-Tessy, Seynod, Saint-Julien CH.
List of respective equipment:
- 1 GF 30rbs Carrier,
- 3 GF 30hxc375 Carrier,
- 1 GF 30xwv Carrier,
- 4 GF eraf 1022a Schneider (data center),
- 8 Inrow Acrc103 and 301h Schneider (data center),
- 2 GF Rb0262.
Year of commissioning 2008.
Offer of preventive maintenance, global curative of EC and steam boilers.
Technical support + monthly visit, on-call 24/24, intervention time 4h, maintenance level 1 to 4, planning over 5 years, Kit 1
Sites: Change Metz-Tessy, mental health, laundries Meythet; Saint-Julien, CH Saint-Julien.
List of equipment:
- 2 gas steam boilers F3339,
- F4131 Cuenod laundries 4 t / h,
- 3 Guillot hot water boilers 3025 kW,
- 2 hot water boilers Unical 557 kW,
- 2 Guillot and Transtub hot water boilers of 1,400 kW.
Year of commissioning boiler EC: 2008.
Offer preventive maintenance, global curative automata.
Technical support: 4 hour response time, Level 1 to 4 maintenance, 5 year planning, Kit 1
Sites: Change Metz- Tessy, mental health.
List of equipment:
- 38 SAIA machines,
- 13 TREND automats,
- 6 Siemens PLCs.
Year of commissioning: 2008.
Provision of preventive, predictive, global healing services for lifts and car doors: 24-hour on-call, 1 hour response time, level 1 to 4 maintenance, 5-year planning, extrication training 1 year / year.
Sites: Change Metz-Tessy, mental health, RSF Annecy (GE Mobile), Seynod, Saint-Julien CH. List of equipment:
- 11 Tal Kone elevators (predictive),
- 54 lifts KONE 175 auto doors,
- 17 Schindler elevators,
- 33 car doors.
Year of commissioning 2008.
The market could be extended to the GHT (Rumilly CH and CH de Gex), a market in progress.
Facility management networks and electrical terminals, HVAC:
- Heating distribution networks, cold water distribution systems - chilled water, ventilation networks, air handling unit, fan coil / air conditioning, hot air curtain, sub-station meter, VMC, smoke extraction, substation exchanger.
- electricity strong currents: TGS, TD, earth network, safety power supply, TD, distributions, electrical terminals (outlets and nannies), control by presence detector, lighting, safety lighting,
- low current electricity: TV screen terminals, technical alarm and remote alarm, rabbet contact, sick call. Kitchen equipment, appliances.