Facade work:
The Hanseatic city of Buxtehude intends to build a sports hall as a replacement building at the integrated comprehensive school (IGS) school site. The new sports hall is planned as a 3-field hall in combination with a 2-field hall. The construction project is to be awarded a sustainability certificate from the German Sustainable Building Council (DGNB) in the “Gold” category.
After completion of the preparatory work on the site, the sports hall will be erected with a supporting structure made of reinforced concrete columns and steel trusses. The hall space of the triple sports hall will be equipped with a spacious grandstand system and the roof of the three-field hall will be greened with roofs.
The specifications describe the services of the façade work for the three- and two-field hall.
1,878 m2 façade insulation glass wool
1,878 m2 façade substructure
1.878 m2 Trapezprofilfassade in Freiform
418 m Base profile façade
418 m Transition profile attic
36 pieces of large vertical aluminium slats (length 6.60 m).