Lot 51 - Redesign of open-air facilities / replacement of BHS
Tree felling 25,00 pcs.
Earthworks 4,500.00 m³
Sewer construction (RW/SW) 680.00 m
Shafts DN 425-DN 1,000 38.00 pcs.
On-board installations / enclosures 1,500.00 m
Winkelstützen 20,00 m
Asphaltarbeiten 870,00 m²
Paving work 1,900.00 m²
wassergebundene Wegedecke 160,00 m²
Blockstufen 50,00 m
Gutter (bonded construction) 200.00 m
Concrete construction work (retaining wall) 20,00 m³
Handrails/ railings 60.00 m
Fence system (metal) 300.00 m
Gate/door systems 4.00 pcs.
Grease trap 1,00 pcs.
Dirty water lifting station 1.00 pcs.
New tree plantings incl. 3 years care 8.00 pcs.
Shrub and perennial plantings incl. 3 years of care 2,400.00 pcs.
Lawn 1,200.00 m²
various equipment elements / fixtures 35,00 pcs.