New construction of inclusive school campus Grevesmühlen, 1.BA regional school as a 4-storey, L-shaped reinforced concrete skeleton building divided into two blocks with 5,800 m² GFA. As part of the overall measure, Lot 26 - painting and varnishing work will be put out to tender.
- Surface plaster made of felted fine plaster (mineral) approx. 8,000m²;
- Wall coatings on lime cement plasters with sol silicate / and dispersion silicate paint approx. 8,000m²;
- Wall coatings on drywall walls with dispersion paint approx. 1,000m²;
- Ceiling coatings on drywall ceilings (including edge friezes) with dispersion paint approx. 2,200 m²;
- Spatula and painting on concrete ceilings approx. 200m²;