Low voltage installation systems
The feed-in takes place from the low voltage grid 400 / 230V of Stadtwerke Weissenburg. The subdistribution as well as the control cabinets of the building services are supplied via the main distribution with power supply measurement.
Installation equipment in the sports hall area are installed in ball-proof design.
Each part of the hall receives a control panel, with which the essential functions can be controlled.
Cable installations through ceilings / walls with fire protection requirements are closed in accordance with the line system directive with approved bulkhead systems.
- electrical distribution 7 pieces,
- cables and cables approx. 15,000 m,
- cable trays and gutters approx. 320 m,
- switches and sockets approx. 330 pieces,
- Fire barriers and wall ducts approx. 70 pieces,
- Telecommunications lines and signal cables approx. 4 000 m,
- Fire alarm panel, approx. 230 detectors 1 piece,
- voice alarm system 1 piece,
- Generally around 460 pieces,
- Sun protection system with central control 1 piece,
- EDP network with approx. 60 connections 1 piece,
- Safety lighting with approx. 240 lights 1 piece,
- Building lighting 1 piece,
- Media columns 4 pieces,
- SHE systems 6 pieces,
- Music system 1 piece.