Civil engineering and pipe laying work
approx. 132,500 m²topfloor
ca. 20,725 m³ ditch excavation
approx. 1,850 m² of road break and restoration
ca. 225 m DN 150 GGG iZ CM
approx. 5,300 m DN 200 GGG iZ ZM
approx. 6,800 m DN 400 GGG iZ ZM
approx. 4,550 m multiple cable protection pipe 3x 50 mm
approx. 100 m DN 150 PP, KG2000
ca. 350 m DN 150 PP, KG2000
ca. 350 m DN 300 PP, KG2000
ca. 1950 m drainage pipe from PVC-U to DN 100
approx. 350 m drainage pipe from PVC-U up to DN 80
2 pcs. vent shafts as prefabricated part (s), incl. installation
2 washers as prefabricated part (s), incl. installation
1 piece connection shaft (SH Horbach)