This tender relates to Nuon’s intention to develop, design, engineer, construct, commission and deliver a 150 MWth Heat production facility (4 x 30 MWth Heat Only Boiler and 30 MWth (3 600 m
Project scope:
— total heat production capacity of approx.150 MWth,
— expect to install fire-tube boilers, rated approx. 30 MWth on natural gas.
Main Equipment involves at least:
1) Fire-tube boilers with Low-NOx burners;
2) Heat Buffer, 3 600 m
3) Civil Works (building construction, roads/pavement) and site preparation/restore construction and site premises;
4) Piping;
5) Electrical and Instrumentation.
An 150 MWth Heat Production Facility (4 x 30 MWth Heat Only Boiler and 30 MWth, 3 600 m
Project scope:
— total heat production capacity of approx.150 MWth,
— expect to install fire-tube boilers, rated approx. 30 MWth on natural gas.
Main Equipment involves at least:
1) Fire-tube boilers with Low-NOx burners;
2) Heat Buffer, 3 600 m
3) Civil Works (building construction, roads/pavement) and site preparation/restore construction and site premises;
4) Piping;
5) Electrical and Instrumentation.
Project location:
Greenfield project — Urban area Amsterdam.
The contract should cover:
— engineering/design,
— procurement,
— construction,
— operational Testing,
— commissioning including testing.
The anticipated contract duration is based on:
— 1,5 year realisation,
— defects notification period.