The order was divided into 3 partial orders, for which separate contracts will be concluded, i.e.
Partial order A:
Design and execution of construction works on the section from Bronów - Wisła Głębce
Partial order B:
Design and execution of construction works on the Goleszów - Cieszyn route
Partial order C:
Design and execution of construction works in the railway traffic sector at covered stations
Inclusion in LCS Skoczów
The entire subject of the Order for part A includes the implementation of the following elements:
1) Project documentation, including:
a) a construction project, including author's supervision,
b) obtaining a building permit and other necessary administrative decisions,
c) preparation of the detailed design,
d) preparation of as-built documentation, including geodetic as-built documentation,
e) conducting the subsystem conformity assessment process and submitting the relevant EC declarations and certificates for subsystems.
2) Implementation of works in the areas of:
a) pavement and track bed,
b) railway traffic control devices (srk),
c) telecommunications equipment and systems,
d) overhead contact line with power supply,
e) power equipment and systems up to 1 kV,
f) engineering facilities,
g) platforms and cubature objects,
h) transitions and crossings,
i) geology.
3) Implementation of works involving the construction of facilities for environmental protection.
The entire subject of the Order for part B includes the following items:
1) Project documentation, including:
a) a construction project, including author's supervision,
b) obtaining a building permit and other necessary administrative decisions,
c) preparation of the detailed design,
d) preparation of as-built documentation, including geodetic as-built documentation,
e) conducting the subsystem conformity assessment process and submitting the relevant EC declarations and certificates for subsystems.
2) Implementation of works in the areas of:
a) pavement and track bed,
b) railway traffic control devices (srk),
c) telecommunications equipment and systems,
d) overhead contact line with power supply,
e) power equipment and systems up to 1 kV,
f) engineering facilities,
g) platforms and cubature objects,
h) transitions and crossings,
i) geology.
3) Implementation of works involving the construction of facilities for environmental protection.
The entire subject of the Order for part C includes the following items:
1) Project documentation, including:
a) a construction project, including author's supervision,
b) obtaining a building permit and other necessary administrative decisions,
c) preparation of the detailed design,
d) preparation of as-built documentation, including geodetic as-built documentation,
e) conducting the subsystem conformity assessment process and submitting the relevant EC declarations and certificates for subsystems.
2) Implementation of works in the areas of:
a) railway traffic control equipment (srk),
b) telecommunications equipment and systems,
c) power equipment and systems up to 1 kV,