Realization of the new "Biomax" heat production unit ZAC Presqu'Île in Grenoble
Construction contract for the construction of the new "Biomax" heat production unit ZAC Presqu'Île in Grenoble. Lot 7 Fire protection.
Fire protection
Mainly consisting of an aerial water source with a volume of 500 m 3 , volume remaining to be confirmed, a fire booster consisting of a motorcycle diesel pump unit running on heating oil, a jockey pump, air control stations supplying sprinklers, deluge-type control station, a set of RIA arranged in the different premises of the installation.