- approx. 150 m prov. Cable raised,
- approx. 160 m cable protection conduit 2 + 3-draft in open and closed construction,
- deliver and install approx. 3 cable ducts,
- lay approx. 160 m of AUSA cable,
- blow in approx. 1 300 m fiber optic cable,
- supply and installation of sleeves under operation,
- Inventory Surveying, Documentation (Inventory Creation),
- Supply and build compact control cabinet and meter connection columns.
- approx. 150 m prov. Cable raised,
- approx. 160 m cable protection conduit 2 + 3-draft in open and closed construction,
- deliver and install approx. 3 cable ducts,
- lay approx. 160 m of AUSA cable,
- blow in approx. 1 300 m fiber optic cable,
- supply and installation of sleeves under operation,
- Inventory Surveying, Documentation (Inventory Creation),
- Supply and build compact control cabinet and meter connection columns.