The subject of the contract includes the reconstruction of the water supply system in Dolna Street and Karpia Street in the area of the tram terminus at Dolna Street and Śląska Street in Łódź with a total length of the project. L= 115,25 m.
The subject of the contract includes the reconstruction of the water supply system in Dolna Street and Karpia Street in the area of the tram terminus at Dolna Street and Śląska Street in Łódź with a total length of the project. L= 115,25 m.