Electricity | Tenderlake

Electricity

Contract Value:
EUR 61M - 61M
Notice Type:
Contract Notice
Published Date:
12 October 2021
Closing Date:
08 November 2021
Location(s):
DE1 BADEN-WÜRTTEMBERG (DE Germany/DEUTSCHLAND)
DE2 BAYERN (DE Germany/DEUTSCHLAND)
DE254 Nürnberg, Kreisfreie Stadt (DE Germany/DEUTSCHLAND)
DE3 BERLIN (DE Germany/DEUTSCHLAND)
DE4 BRANDENBURG (DE Germany/DEUTSCHLAND)
DE5 BREMEN (DE Germany/DEUTSCHLAND)
DE7 HESSEN (DE Germany/DEUTSCHLAND)
DE8 MECKLENBURG-VORPOMMERN (DE Germany/DEUTSCHLAND)
DE9 NIEDERSACHSEN (DE Germany/DEUTSCHLAND)
DEA NORDRHEIN-WESTFALEN (DE Germany/DEUTSCHLAND)
DEB RHEINLAND-PFALZ (DE Germany/DEUTSCHLAND)
DEC SAARLAND (DE Germany/DEUTSCHLAND)
DED SACHSEN (DE Germany/DEUTSCHLAND)
DEE SACHSEN-ANHALT (DE Germany/DEUTSCHLAND)
DEF SCHLESWIG-HOLSTEIN (DE Germany/DEUTSCHLAND)
DEG THÜRINGEN (DE Germany/DEUTSCHLAND)
Description:
Federal Employment Agency throughout Germany, supply of green electricity

Energy supply 100% green electricity

Delivery period 2022-2023

Properties of the Federal Employment Agency throughout Germany in 4 lots

RD BB, N, S, SAT

- properties of the Federal Employment Agency throughout Germany in 4 lots.

- supply of electrical energy with the associated services for the conducted supply of properties (final consumers) of the Federal Employment Agency (BA).

- 100% green electricity must be supplied to the delivery points in lot 1, 2, 3 and 4.

- Based on the 2020 consumption figures, the reference delivery quantity is approximately 110,576,277 kWh per year.

- The formation of single lots was based on the regional belonging of the properties to the regional infrastructure management (RIM) in the regional directorates (RD) as well as the total consumption of the year 2020 (lot 1: approx. 29.309 GWh, lot 2: approximately 27.893 GWh, lot 3: approx. 33.653 GWh and lot 4: approx. 19.720 GWh) of the individual lots.

Lot 1, the RIM collection points form:

- Berlin and Potsdam (RD BB),

- Kiel and Rostock (RD N),

- Chemnitz (RD S),

- Magdeburg (RD SAT).

RD NRW, NSB

- properties of the Federal Employment Agency throughout Germany in 4 lots.

- supply of electrical energy with the associated services for the conducted supply of properties (final consumers) of the Federal Employment Agency (BA).

- 100% green electricity must be supplied to the delivery points in lot 1, 2, 3 and 4.

- Based on the 2020 consumption figures, the reference delivery quantity is approximately 110,576,277 kWh per year.

- The formation of single lots was based on the regional belonging of the properties to the regional infrastructure management (RIM) in the regional directorates (RD) as well as the total consumption of the year 2020 (lot 1: approx. 29.309 GWh, lot 2: approximately 27.893 GWh, lot 3: approx. 33.653 GWh and lot 4: approx. 19.720 GWh) of the individual lots.

Lot 2, the RIM collection points form:

- Dortmund, Düsseldorf and Cologne (RD NRW),

- Bremen-Bremerhaven and Hanover (RD NSB).

RD BW, BY, H, RPS

- properties of the Federal Employment Agency throughout Germany in 4 lots.

- supply of electrical energy with the associated services for the conducted supply of properties (final consumers) of the Federal Employment Agency (BA).

- 100% green electricity must be supplied to the delivery points in lot 1, 2, 3 and 4.

- Based on the 2020 consumption figures, the reference delivery quantity is approximately 110,576,277 kWh per year.

- The formation of single lots was based on the regional belonging of the properties to the regional infrastructure management (RIM) in the regional directorates (RD) as well as the total consumption of the year 2020 (lot 1: approx. 29.309 GWh, lot 2: approximately 27.893 GWh, lot 3: approx. 33.653 GWh and lot 4: approx. 19.720 GWh) of the individual lots.

Lot 3 is the RIM collection points:

- Karlsruhe-Rastatt and Stuttgart (RD BW),

- Munich and Nuremberg (RD BY),

- casting (RD H),

- Mainz (RD RPS).

BA - Service house

- properties of the Federal Employment Agency throughout Germany in 4 lots.

- supply of electrical energy with the associated services for the conducted supply of properties (final consumers) of the Federal Employment Agency (BA).

- 100% green electricity must be supplied to the delivery points in lot 1, 2, 3 and 4.

- Based on the 2020 consumption figures, the reference delivery quantity is approximately 110,576,277 kWh per year.

- The formation of single lots was based on the regional belonging of the properties to the regional infrastructure management (RIM) in the regional directorates (RD) as well as the total consumption of the year 2020 (lot 1: approx. 29.309 GWh, lot 2: approximately 27.893 GWh, lot 3: approx. 33.653 GWh and lot 4: approx. 19.720 GWh) of the individual lots.

Lot 4 is the RIM collection points:

- BA - service house.

Download full details as .pdf
The Buyer:
BA - Gebäude-, Bau- und Immobilienmanagement GmbH
CPV Code(s):
09310000 - Electricity