The turnkey realization of a 4-speed secondary school including a school sports hall as a two-field hall is planned.
The construction project also includes the associated outdoor facilities as well as the furnishing / equipment of the school and sports hall.
In advance, an existing building was demolished (school prefabricated building) and a construction site clearing with Flächenentsiegelung and area leveling carried out.
Delivery and installation in the school and in the sports hall:
- Substrate preparations (about 5 030 m
- Protective cover of floor coverings for remaining construction time (about 1 225 m
- Flooring linoleum R9 (about 3 730 m
- Staircase made of linoleum on treads and risers (132 pcs.),
- Flooring Linoleum R 10 (about 360 m
- Initial cleaning and grooming linoleum (about 4 490 m
- Textile flooring velor (about 370 m
- Skirting Beech solid white painted (about 1 835 m
- expansion and movement joint profiles (about 625 m),
- PUR floor coating R9 (about 250 m