OO-CONSTRUCTION -132KV UGC REINFORCEMENT WORKS LT000091 SKYE - 0728

The works include for the design, supply, installation, testing and commissioning of electricity transmission underground cable works as part of the Skye 132kV Reinforcement scheme.

The works consist of 24km of new 132kV double circuit, two cable per phase (see figure 1 below).

These works include:

• Undergrounding of the section of the new 132kV double circuit out of Fort Augustus substation for 9km toward Invergarry. Including a single fibre optic cable.

• Laying of haul roads and accesses to the cables and sealing end compounds. 

• All associated substation and SEC tie in works 

• Reinstatement on completion of all works.  

Installation and commissioning of 132kV underground cable by Fort Augustus.

Awarded to:
OO-CONSTRUCTION -132KV UGC REINFORCEMENT WORKS LT000091 SKYE - 0728
WOOD TRANSMISSION AND DISTRIBUTION LIMITED, Knutsford (UK)
Download full details as .pdf
The Buyer:
Scottish Hydro Electric Transmission Plc
CPV Code(s):
45230000 - Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork