Facade work | Tenderlake

Facade work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
08 May 2023
Closing Date:
07 June 2023
Location(s):
DE118 Heilbronn, Landkreis (DE Germany/DEUTSCHLAND)
Description:
Hohenstaufengymnasium BA 1 New building Cube (HSG) - PR façade (wood-aluminium)

The construction project is a three-storey new building in which the load-bearing elements are largely made of reinforced concrete. Due to the poor subsoil conditions, the foundation is carried out via bored piles. The surrounding area jumps between the east and west sides by one floor, the basement is completely integrated into the ground on the west side.

Wasserlastpfahl W1.2-E (> Drainage).

The upper floor is reduced to about 2/3 of the total area. The flat roof above the upper floor receives a PV system, the flat roof above ground floor is designed as a green roof.

The almost completely circumferential window façade is made of aluminium as a mullion-transom façade. In front of it, a superior precast concrete façade comes all over all floors - alternating between senkr. Supports and scales. Bars, each at a depth of 70 cm - for execution.

Coarse mass:

- 710 m2 mullion-transom façade, wood-aluminium

- 450 m2 Raffstoreanlage

- 10 m2 aluminum windows

Download full details as .pdf
The Buyer:
Bauamt Bad Wimpfen
CPV Code(s):
45443000 - Facade work