JVA Kauramäenkylä divided chore:
1. Construction work (main work)
2. LV technical work (side-chore)
3. IV technical work (side-chore)
4. Electrotechnical work (side-work)
5. Building automation bladder (side-work)
6. Sprinkler system work (side-chore).
Building site address:
Tail Tiaisentie 2, EN-40530 Jyväskylä (Kauramäki), plot 30-34-15
Two (2) single-storey (1 floor) buildings for service living for the elderly, a yard area, yard buildings and a parking area.
The plot covers an area of 18,852 m
Preliminary construction time 11—12/2021—6/2023.
JVA Kauramäenkylä's main workJVA Kauramäenkylä construction works (main works). The branch works are subjected to the main work by the RT 80271 minor subordination agreement.
JVA Kauramäenkylä LV chore (side work)JVA Kauramäenkylä LV technical work.
The LV work will be subordinated to the main contractor RT 80271 by a minor subordination contract.
JVA Kauramäenkylä IV technical work (side-chore)JVA Kauramäenkylä ventilation raka (side-chore).
JVA Kauramäenkylä Electrotechnical work (side)JVA Kauramäenkylä electric works (side-chore).
JVA Kauramäenkylä Construction Automation Rakka (Side-work)JVA Kauramäenkylä construction automation travaka (side-chore).
The construction automation fracture will be subordinated to the prime contractor RT 80271 by a minor subordination contract.
JVA Kauramäenkylä sprinkler system work (side-chore)JVA Kauramäenkylä sprinkler system work (side works).
The SPR will be subordinated to the prime contractor RT 80271 by a page-work subordination agreement.