Dry construction work as part of fire protection and energy upgrading as well as the conversion and renovation of all floors of the main building of the Maximilian Kolbe School in Neunkirchen-Wiebelskirchen, which is sponsored by the Bishopric of Trier. The drywall work will be carried out in 2 construction stages. The work takes place during the individual construction phases, with the exception of school holidays, during ongoing school operations.
The Maximilian Kolbe School was built around 1975 as a reinforced concrete skeleton structure (TT-girder ceilings on the ground floor and upper floors) or reinforced concrete / masonry construction (basement) with non-load-bearing system partition walls (so-called "Mechel walls") as interior walls and a curtain-type mullion-transom facade. The building has 5 floors (basement-3rd floor) and a technical floor. Due to its age, there are deficits in the building with regard to technical systems, fire protection, energy balance, etc., which should be remedied in the course of the renovation.