The work consists in particular of: - road works - network works - engineering works Quantity of work: - excavated material, soil class 2:1,000 m³ - cuttings, soil class 3 - 5:5,000 m³ - cuttings, soil class 6 and 7:1,000 m³ - Crushing materials of class 6-7 in caliber 0/150:20,000 m³ - Backfill in quarry crushed 0/250 and 0/150:50,000 m³ - 0/150 crushed backfill from the crushing plant on site: 20,000 m³ - Bituminous mix: 9,350 to - L-shaped retaining wall: 120 m - Realization of a vertical retaining wall made of concrete panels: 1.400 m² Construction time: 190 working days Expected start of work: early October/November 2022
The work consists in particular of: - road works - network works - engineering works Quantity of work: - excavated material, soil class 2:1,000 m³ - cuttings, soil class 3 - 5:5,000 m³ - cuttings, soil class 6 and 7:1,000 m³ - Crushing materials of class 6-7 in caliber 0/150:20,000 m³ - Backfill in quarry crushed 0/250 and 0/150:50,000 m³ - 0/150 crushed backfill from the crushing plant on site: 20,000 m³ - Bituminous mix: 9,350 to - L-shaped retaining wall: 120 m - Realization of a vertical retaining wall made of concrete panels: 1.400 m² Construction time: 190 working days Expected start of work: early October/November 2022