The project is for an extension of an existing quay 36, for a total of 82.4 m eastwards. The quay shall i.a. used as a future container port To achieve sufficient water depth, dredging is required as well as blasting under and in front of the the new quay 36.
The project is for an extension of an existing quay 36, for a total of 82.4 m eastwards. The quay shall i.a. used as a future container port To achieve sufficient water depth, dredging is required as well as blasting under and in front of the the new quay 36.