The scope shall be for the Contractor to be responsible for Design and Construction of a warehouse referred to as Alex Dock Multi User Warehouse (MUW) based at Port of Liverpool.
The footprint of the warehouse is approximately 247,500 square foot and it is to be designed to maximise the clear internal height.
The scope includes but is not limited to:-
Ground preparation and foundation works
Warehouse frame, push walls, cladding and roof lights
Associated power, water and waste connections
External lights
External surfacing
External barriers, bollards and fencing
Office and welfare facilities
Weighbridges and marshalling cabin
Car park area including EV charging, signage and white lining
Warehouse to be designed and built in line with current building regulations the Peel Ports Group HSE Fire Safety requirements.