The new construction as a concrete structure is organized on 4 floors (ground floor + 3 upper floors). Appearance to the outside with a facing brickwork, in which individual window areas are arranged on the ground floor and continuous window bands on the 3 upper floors. The building opens on the ground floor in some areas through a mullion-transom facade. There you enter the atrium with the open step landscape and the meeting place for max. 500 people. The atrium is closed off above the 3rd floor with a flat-pitched glass roof. The glass roof is surrounded by a slightly sloping roof, an unkempt flat roof with all-round parapet and internal drainage. Inside is the atrium on the ground floor as a multifunctional room with a stage, a kitchen and the administration rooms. The first floor is accessed via a staircase with seating steps in the direction of the stage.
- approx. 400 m
- approx. 1 400 m³ excavation + disposal,
- approx. 2,000 m³ excavation + installation,
- approx. 3,000 m
- 3 high tribes,
- 11 topiaries,
- 350 hedge plants,
- approx. 270 m
- approx. 620 m pipes,
- 1 grease separator,
- 12 inspection shafts,
- 20 street gullies,
- approx. 75 m drainage channels