New 3U transfer structure and economic routes
Type of service: Civil engineering: New construction of bridge B 180n - BW3Ü; WW bridge Welbsleben (ASB Nr. 4234 507) Bridge area=141m²; Single-field steel-reinforced concrete composite frame made of 2 pcs hollow steel box-composite elements; Length 23.5 m; Weight 34 t; Shallow foundation; 6,900 m³ soil removal or excavation; 8.500 m³ soil application or excavation backfill,1,000 m³ of cement-reinforced building backfill; 600 m³ of concrete and reinforced concrete
Road construction: Production of a construction bypass in the construction site; set up traffic management conditions 2 pieces; topsoil removal, storage and re-installation 800 m³; topsoil removal 7,500 m³; soil improvement with hydr. binders 11,000 m²; construction roads 8,000 m²; Ländl. Making asphalt paths 500 m²