Earth and concrete construction work for channel repair on the Kanker torrent in one construction phase.
Restoration of the paved water bed including renewal of the two reinforced concrete bank walls, length approx. 280 m, width approx. 2.70 m.
Get our periodical newsletter about how sell more to the public sector and how to make the most of Tenderlake.