Administration building Hüttenstraße 14 Modernization and roof expansion — lot 313 drywall works.
— cancel raster ceiling 655 m
— partition wall drywall 425 m
— double column wall DG 345 m
— installation caffered from GK 300 m
— planking additional panel position 535 m
— dry screed 2 x 12.5 mm +impact sound 720 m
— grid ceiling dismantling and replacement 90 m
— acoustic raster ceiling 625/625 mm 2570 m
— wall connection angle raster ceiling 2300 m
— edge frieze from GK 360 m,
— ceiling aprons made of GK 255 m,
— Mounting single and surface-mounted luminaires 420 pcs,
— perforated acoustic ceiling GK 440 m
— caffered from GK blanket 100 m
— Performances 380 St.