Contract Value:
-
Notice Type:
Contract Notice
Published Date:
06 November 2020
Closing Date:
08 December 2020
Location(s):
DE267 Haßberge (DE Germany/DEUTSCHLAND)
Description:
009 ventilation and refrigeration technology

Ventilation technology:

The ventilation of the new building of the Free Waldorf School Haßfurt is realized by means of manual window ventilation. This was checked by the building construction department.

The toilet cores are provided with an exhaust system, for this purpose F90 shafts are being built by the building construction, which ensure fire protection across all floors.

The exhaust air from the toilets is routed over the roof by means of an exhaust fan.

The kitchen of the cafeteria is mechanically ventilated and ventilated with a central air handling unit. In order to keep the cable routes as short as possible, the device is set up in the adjacent warehouse (room 0.31).

The exhaust air is led over the roof, the outside air is led over the facade.

The specialist cabinets and poison cabinets are ventilated by means of an encapsulated roof fan, the pipeline is to be designed as a welded plastic pipeline (material PPS).

The poison cabinets must be vented permanently, the specialist cabinets only during use. Sufficient supply air must be made available while the specialist cabinet is being used.

So that there is no negative pressure in the room (keep the window open when the specialist cabinet is in operation).

Refrigeration technology:

Cooling systems are installed in rooms with high internal loads (1 x IT / server room). A humidity treatment according to VDI 6040-1 points 4.2, 4.3 does not take place in any area.

Ventilation technology:

The ventilation of the new building of the Free Waldorf School Haßfurt is realized by means of manual window ventilation. This was checked by the building construction department.

The toilet cores are provided with an exhaust system, for this purpose F90 shafts are being built by the building construction, which ensure fire protection across all floors.

The exhaust air from the toilets is routed over the roof by means of an exhaust fan.

The kitchen of the cafeteria is mechanically ventilated and ventilated with a central air handling unit. In order to keep the cable routes as short as possible, the device is set up in the adjacent warehouse (room 0.31).

The exhaust air is led over the roof, the outside air is led over the facade.

The specialist cabinets and poison cabinets are ventilated by means of an encapsulated roof fan, the pipeline is to be designed as a welded plastic pipeline (material PPS).

The poison cabinets must be vented permanently, the specialist cabinets only during use. Sufficient supply air must be made available while the specialist cabinet is being used.

So that there is no negative pressure in the room (keep the window open when the specialist cabinet is in operation).

Refrigeration technology:

Cooling systems are installed in rooms with high internal loads (1 x IT / server room). A humidity treatment according to VDI 6040-1 points 4.2, 4.3 does not take place in any area.

Download full details as .pdf
The Buyer:
Gründungskreis Waldorfschule Mainfranken
CPV Code(s):
42512300 - HVAC packages
45000000 - Construction work
45331000 - Heating, ventilation and air-conditioning installation work
45331200 - Ventilation and air-conditioning installation work
45331210 - Ventilation installation work
45331230 - Installation work of cooling equipment