Earthworks, road construction and pipe-laying work
- Absorb 2,800 m² asphalt surface and restore it in 2 layers
- 2,620 m of pipe trench and backfilling
- 165 m PE-RC pipe 250 x 22.7 as thermowell in HDD process
- 2,750 m PE-RC pipe 110 x 10 supply and installation
- 2,570 m cable conduit 50 x 4.6 supply and installation
- 6 units of fitting shafts DN 1500 supply, set and equip