Sanitary facilities.
Sanitary facilities and equipment:
- Installation and equipment of approx. 250 patient baths with shower, toilet and sink,
- Installation and equipment of toilet and shower rooms for staff and visitors with approx. 149 toilets and 131 sinks, 3 urinals and 19 showers.
Drinking water system:
- approx. 29,000 m drinking water pipe made of stainless steel or composite pipe,
- 6 pieces of drinking water heating systems with circulation system.
VE and pure water installation:
- approx. 750 m pure water pipes made of PP-H,
- approx. 1 450 m stainless steel pipes for softened and demineralized water.
Formalin and old formal installation:
- approx. 135 mm formalin supply lines made of PVDF tube,
- approx. 115 m of old formal pipes made of PVC U pipe.
Drain installations:
- 4 sewage lifting units,
- approx. 10,000 m SML cast pipes for downpipes and collecting pipes,
- approx. 1 400 m PP waste water connection pipes.
Installation components:
- approx. 1,500 sanitary installation elements.
Maintenance work combinations:
- 13 pieces of care work combinations with soaking tanks and bedpan washers.
Hygiene device:
- approx. 660 soap dispensers,
- approx. 1 100 disinfectant dispensers,
- approx. 700 towel dispensers.