Fiber Optic — Supporting School Center, Münster; Martin - Luther-King School, SQ, New Replacement Building (Good School 2020); 21-361 E
Painters — painting work.
— 10 500 m 2 surface pretreatment walls;
— 3 750 m 2 walls covering full surface Q 3;
— wallpapering 9 500 m 2 wall surfaces with rapidvlies;
— 10 400 m 2 base and intermediate coat;
— 10 400 m 2 final coat;
— cover 1 150 m window lintel and soffit with Rapidvlies;
— — 3 300 m 2 underground pretreatment ceilings;
— 2 475 m 2 ceilings + full-surface trolleying stair barrels Q 3;
— smooth puttying 1 980 m ceiling frieze;
— 2 620 m 2 base- + intermediate painting ceilings+stair runs;
— 2 620 m 2 final coat ceilings+stair runs;
— 1 970 m painting ceiling frieze;
— 135 m coating with fleece roof truss aula;
— 142 pcs painting steel frame; other.