Spital Waldshut Interimsanbau "Nordbau" foundation, steel construction, open spaces
Klinikum Hochrhein GmbH plans to build additional capacity with approx. 2,840 m in order to create additional capacity 2 BGF and about 10 760 m 3 BRI to the existing hospital in Waldshut. It will be erected above the forecourt at the main entrance to the hospital as a three-storey modular building and raised on a single-storey steel structure. On one floor there is an intensive care unit with 14 beds, on the other two floors there is one general ward with 24 beds each. The technical center is housed on the roof. The interim building will be connected to the existing building via 2 three-storey connecting bridges.
The services are advertised in the following trades:
- foundation, steel construction, open spaces,
- Room module turnkey.
Preparation of the site for the construction project. Creating the foundations and the steel grate construction as a mounting surface for the room modules. Entire construction as steel composite construction F90. Restoration of areas of outdoor facilities with paths and parking spaces and their drainage.
Area construction field approx. 1 100 m 2 approx. 25 pieces of individual foundations approx. 120,000 kg steel