EI&C technology
Creation of 4 separate switchgear with a total of 24 control cabinet panels
and supply lines up to 300 mm²
- Construction of the main cable routes for two machine buildings with 660 m
Kabelwegen
- Lighting and general installation for 2 machine buildings, PLC and
PLS control for a new aeration tank, 1 secondary clarifier,
1 digestion plant, 1 gas storage tank, 6 pumping stations and interfaces to
6 Maschinengewerken
EI&C technology
Creation of 4 separate switchgear with a total of 24 control cabinet panels
and supply lines up to 300 mm²
- Construction of the main cable routes for two machine buildings with 660 m
Kabelwegen
- Lighting and general installation for 2 machine buildings, PLC and
PLS control for a new aeration tank, 1 secondary clarifier,
1 digestion plant, 1 gas storage tank, 6 pumping stations and interfaces to
6 Maschinengewerken