Renovation of Teckschule Wernau (3.BA) and renovation of kindergarten "Haus des Kind" - painting work
The construction site is located in the area of the area of the "Teckschule".
The school building is to be completely renovated in 3 construction phases, the subsequent kindergarten "House of the Child" is also to be renovated.
The present list of services includes the work in the 3rd construction phase of the school building (extension basement and ground floor) as well as in the kindergarten "House of the Child" (ground floor).
It is a solid building from the 1960s.
School building area
Outer walls:
Masonry, concrete
Cover:
via basement: ribbed ceiling and concrete ceiling
above ground floor: ribbed ceiling
Kindergarten area
Outer walls:
Masonry, concrete
Cover:
above ground floor: reinforced concrete ribbed ceiling and concrete ceiling
The building services are completely renewed.
The building envelope (windows, roof surfaces and facades) will be preserved. Floor plan changes and modernizations are made.
In the buildings adjacent to the construction site, school operations will continue.
Extent of the work:
Teckschule:
- Ground sanding approx. 1087 m2
- Full-surface filling approx. 1136 m2
- Glasfasergewebe ca. 1277 m2
- Paint fiberglass fabric approx. 1227 m2
- Painting smooth fleece on ceilings approx. 207 m2
- Painting on GK acoustic ceiling surfaces approx. 330 m2
- Wallpaper staircase incl. painting approx. 60 m2
- Floor coating approx. 65 m2
- Hollow throat and wall connection approx. 69 m
- Lacquer paint steel frames, 31 – 42 cm unwinding approx. 203 m
- Verification work approx. 40 hours
Child's house:
- Ground sanding approx. 557 m2
- Full-surface filling approx. 680 m2
- Glasfasergewebe ca. 730 m2
- Painting glass fibre fabric approx. 773 m2
- Painting smooth fleece on ceilings approx. 111 m2
- Painting on GK acoustic ceiling surfaces approx. 190 m2
- Lacquer painting steel frames, 31 – 42 cm unwinding approx. 62 m
- Verification work approx. 40 hours