Boiler installations | Tenderlake

Boiler installations

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
16 November 2016
Closing Date:
29 November 2016
Location(s):
DK022 Vest- og Sydsjælland (DK Denmark/DANMARK)
Description:
ASV8 Superheater.

The purpose of the project is to replace the electrical superheater belonging to the 98 MW steam boiler, which is backup for the steam supply from Asnaesvaerkets unit 2 and unit 5. The scope of the agreement is basically engineering, manufacturing and shipping of superheater and power modulation unit.



The key scope of the supply is an electrical steam superheater and a power modulation units with a heating capacity of approx. 7.5 MW.

The superheater is configured in line after a 98 MW steam boiler, which works as backup for the Asnaes Vaerket unit 2 and unit 5. During normal conditions the steam enters the superheater at approx. 20 bar saturated and lives the superheater with a temperature of approx. 300 deg. C.

The purpose of the project is to increase the steam supply availability as well as to bring down the maintenance costs. Availability is a key word due to the fact that the heat customers requires uninterrupted supply of steam. Following reliability and a ‘service friendly’ configuration of the new superheater is of major importance.

Download full details as .pdf
The Buyer:
DONG Energy Thermal Power A/S
CPV Code(s):
42160000 - Boiler installations
42161000 - Hot-water boilers
42162000 - Steam-generating boilers
42163000 - Steam generators
42164000 - Auxiliary plant for use with boilers
42165000 - Steam condensers
44615000 - Pressure vessels
44615100 - Steel pressure vessels
44621210 - Water boilers
44621220 - Central-heating boilers
44622000 - Heat-recovery systems
44622100 - Heat-recovery equipment